Commercial overviewCOM-A New construction
Underground through trim, on buildings that have a completion date somebody is already counting against. Conduit installation, branch circuit wiring, panels and devices, delivered in the sequence the programme needs them.
COM-A1 Scope by stage
Conduit and duct bank in the ground before the slab goes down. This is the least forgiving stage on the whole job, because correcting it afterward means breaking concrete. It gets laid out from the drawings and verified before the pour.
Conduit installation through the structure, boxes set, homeruns pulled to the panel locations, branch circuit wiring run and supported. Coordinated with mechanical and plumbing so three trades are not competing for the same ceiling space.
Devices, fixtures, panel terminations, labelling and testing. Inspections scheduled rather than hoped for, and a panel schedule that matches the building as built instead of as drawn.
The same stages compressed into an occupied building, usually with a live floor above or beside you. Most tenant packages also involve removing what the previous occupant left behind.
COM-A2 Coordination
On a commercial build, the electrical contractor who causes the fewest arguments is worth more than the one who bid two percent lower.
We plan against the general contractor's programme, flag conflicts when we see them on the drawings rather than when we hit them in the ceiling, and staff the job with our own crew so a promised date does not depend on somebody else's availability.
Conflicts and missing information raised before mobilisation, in writing.
Each stage sized to the programme, with manpower committed against dates.
Scheduled with the authority having jurisdiction and prepared for in advance.
Labelled panels, corrected schedules and documentation handed to the building's operators.
COM-A3 Related
New construction sits under the commercial pillar.
COM-00
The parent page: what commercial scopes we take, how we price them and what general contractors get from the crew.
Commercial overviewDEM-01
The removal side of a tenant or refurbishment package, handled by the same crew doing the new installation.
Selective demolitionSend the electrical package and the programme. We will come back with a written scope and a price against the dates.